North Oakville School Boundaries: A Buyer's Guide for 2027
Buying in North Oakville? See how the new high school (Sept 2027), approved boundary changes, redirections and busing affect your child's designated school.

You find a townhouse near Sixth Line that ticks every box, and the listing says it is close to a brand-new high school. Your agent mentions a review that could move some elementary students. A neighbour says their children were sent to a school outside the area for two years. Each of these can be true at the same time, because North Oakville school boundaries have been changing almost every year as new streets fill in and new schools open.
North Oakville School Boundaries: How They Are Set
A school boundary, which the boards also call a catchment or attendance area, is the set of addresses assigned to a school for a given program. In Halton, each board sets its own boundaries, so one home has a public English-track school, a public French Immersion school, a Catholic school and a secondary school for each of those programs. They are separate answers, and they do not always share the same lines.
Boundaries are not drawn by a builder, a listing or a community name. They change through formal processes that the boards publish:
Boundary reviews, which trustees must approve before they start and must vote on before anything changes.
New school openings, which need a boundary of their own and often pull streets away from nearby schools.
Temporary redirections, which send new registrations elsewhere when a school is full.
Holding schools, which serve a new area until its planned school is built.
For North Oakville, all four have been in use since the early 2020s. That is why two neighbours a few streets apart can have children at different schools, and why the answer for a home you buy this winter may differ from the answer for the same home in 2028.
What the HDSB Review Procedure Requires
The HDSB School Boundary Review Administrative Procedure sets the steps. After trustees approve a review, a Boundary Review Steering Committee of trustees, senior staff and planning staff decides which schools are included and which of two pathways to use.
Pathway 1 is for complex reviews with several options or many affected families. A Boundary Review Committee with parent members is formed, at least one public information meeting is held, and feedback is collected through an online survey and a temporary email address.
Pathway 2 is for limited changes with less impact. It skips the parent committee.
In both pathways, the Director of Education makes a recommendation and the Board of Trustees makes the final decision. Members of the public can delegate at a board meeting before the vote. For the new high school, HDSB ran both pathways at the same time: Pathway 1 for the boundary north of Dundas and Pathway 2 for French Immersion south of Dundas.
The Criteria Trustees Weigh
The same procedure lists the criteria the committees must consider when drawing options. In plain terms, they are:
Keeping each boundary geographically connected and respecting natural or built barriers.
Keeping enough students to run a program properly.
Maximizing walk-to-school options and safe routes while limiting busing.
Balancing enrolment and reducing portables over the short, medium and long term.
Producing stable boundaries that will not need to change again soon.
Limiting how often a student has to switch schools and keeping cohorts and families together.
Knowing these criteria helps when you read a review's options. A street that sits beside a barrier, such as a creek valley or a major road, or a pocket of homes that is far from its current school, is more likely to be discussed.
How to Check Your Home's Designated School
Use the official tools for each program your family needs, and repeat the search before you firm up an offer, because results reflect the boards' current boundaries, not future ones.
Public Board: HDSB Find Local School
The HDSB Find Local School tool asks for a home address or school name and returns the English and French Immersion home schools. The page asks anyone moving into a new area to check whether the address may be affected by a current or upcoming boundary review, and it tells rural addresses to confirm their school of attendance using the locator and the transportation eligibility check. Problems with the locator go to HDSB Planning by email.
Catholic Board: HCDSB School Finder
The HCDSB School Finder lets you search by home address to find the home school, or search by school to see its boundary map. The board notes that its school boundaries are subject to change on a yearly basis. Requests to attend a school outside your boundary fall under Board Policy I-04 and depend on how much space the school has.
The New Secondary School Address Locator
For high school, HDSB has a separate Oakville Secondary School Address Locator that shows whether an address falls inside the catchment for the new North Oakville secondary school. The page makes three points buyers often miss:
French Immersion will not be offered at the new school.
The "non-transported" road areas shown on the map are preliminary.
Families outside the boundary are welcome to enrol but will not be eligible for transportation.
What a Locator Result Does Not Tell You
A locator result shows the current assignment for the program you searched. It does not promise a seat in a particular class, it does not show a review that has not been decided, and it does not confirm busing. Transportation is a separate check with Halton Student Transportation Services, covered below. For younger children, North Oakville elementary school boundaries work the same way: the tool gives today's answer, and the registration documents confirm it.
The New High School at 4020 Sixth Line
The biggest change for North Oakville families is secondary. HDSB is preparing to open the New Oakville Secondary School at 4020 Sixth Line in September 2027. Until a name is approved, the board uses that working name, and its planning documents call it Oakville NE #1 HS.
What the Board Has Announced
According to HDSB's information on the school:
It will open in September 2027 with Grade 9 and Grade 10 students, then add Grades 11 and 12 in 2028 and 2029.
The building provides roughly 1,330 to 1,340 pupil places, depending on the HDSB document, and includes 88 licensed child care spaces.
It will include a Community Pathways Program and the Secondary Gifted Cluster.
It will house APEX, the Academy for Athletic Performance and Excellence, a regional sports program open to eligible secondary students across Ontario.
Oakville Transit is planning service to support the opening, with details to be shared before September 2027.
The Name Is Not Final Yet
HDSB collected public name suggestions from 17 August to 13 September 2026. Its school naming page sets out the remaining steps: a naming committee builds a shortlist, the Board of Trustees selects a recommended name, the Ministry of Education gives final approval, and only then is the official name announced. Until that happens, any name used in a listing should be treated as unconfirmed.
The Approved Oakville NE #1 Boundary
Trustees started the Oakville NE #1 Secondary School and French Immersion Review on 4 November 2025, held a virtual public information meeting on 2 March 2026, and approved Option 3 at the 5 May 2026 board meeting. Implementation starts in September 2027 and is planned over three or more years.
Where Students Go Until the New School Opens
According to the board's implementation charts, English and French Immersion secondary students in all ten planning zones north of Dundas Street are assigned to White Oaks Secondary School until the new school opens.
Who Moves in September 2027
The board divides the area north of Dundas into ten zones, and the Option 3 maps show which zone a street falls in. For English-track students, the planning notes say Oakville NE #1 HS opens in September 2027 as a Grade 9 and 10 school for Zones 2 to 10. Zone 1, the Palermo PS area, is directed to Garth Webb SS instead. The English feeder schools named in the board's notes are Dr. David R. Williams PS, Harvest Oak PS, Oodenawi PS and, once it opens, Oakville NE #5 PS.
For French Immersion, the board's Year 1 implementation table and Option 3 notes place Grade 9 students from Zones 1, 2 and 7 at Garth Webb SS, from Zones 3 to 6 at White Oaks SS, and from Zones 8 to 10 at Iroquois Ridge HS. The board notes that Zone 6 remains a split cohort at Forest Trail PS, and that all of these French Immersion boundaries north of Dundas are subject to the Northwest Oakville review, so confirm the current placement before relying on it.
Grade 8 students graduating in June 2027 who live outside the new school's boundary are directed to Garth Webb SS or Iroquois Ridge HS, depending on their program. Students in Grade 9 as of September 2027 are redirected to their new schools.
How Current Students Are Protected
The approved option includes legacy exemptions. According to HDSB's review page:
Students in Grades 10 to 12 as of June 2027 can remain at their existing school with transportation.
Younger siblings who want to stay with an older sibling at White Oaks SS are granted a legacy exemption, with transportation, until the older sibling graduates.
Trustees also approved transportation for legacy-exempted students and courtesy seat requests for younger siblings.
In the board's livestream answers, a student who will be in Grade 10 IB Prep at White Oaks in September 2027 can remain there if they stay in that program.
The new school then adds a grade each year until it serves Grades 9 to 12 in 2029-30.
French Immersion Is Not Settled North of Dundas
The approval itself states that the French Immersion boundaries north of Dundas Street are subject to the results of the Northwest Oakville elementary review, to avoid splitting a Grade 8 class between two high schools. If French Immersion matters to your family, the next section is worth reading closely.
Elementary Reviews and New Schools to Watch
Several elementary reviews and new school projects are moving at the same time, and each can change the answer for a given address.
The Northwest Oakville Elementary Review
The Northwest Oakville Elementary Boundary Review began in March 2025, was paused while staff reviewed program offerings, and was restarted by trustees on 2 June 2026. Trustees added Sunningdale PS and Dr. David R. Williams PS so that elementary French Immersion boundaries can line up with the new secondary boundaries. The review may affect ten schools: Abbey Lane, Captain R. Wilson, Dr. David R. Williams, Emily Carr, Forest Trail, Heritage Glen, Palermo, Pilgrim Wood, Sunningdale and West Oak.
The board's stated goal is to address the growing imbalance in enrolment among elementary schools south of Dundas Street, looking at both English and French Immersion programs. The board planned a committee with parent and guardian members, targeted a decision on a final option for winter 2026, and said changes could take effect as early as September 2027, possibly phased over several years. The board notes that the timeline is subject to change, and options and meeting dates are posted on the review page as they become available.
Harvest Oak and Oakville NE #5
The Oakville NE #3 and #5 boundary review set boundaries for two new North Oakville elementary schools. Trustees approved Option 7 on 24 January 2024, effective for the 2024-25 school year and phased over three or more years. In June 2024, the board amended the plan so that new move-ins in Grades 1 to 8 in one zone that was moving to Oodenawi PS would instead register at Dr. David R. Williams PS, because more families than expected were moving in.
The first of those schools, Oakville NE #3, opened in September 2025 as Harvest Oak Public School. The board's 2025-2026 Long-Term Accommodation Plan describes it as a 788 pupil place facility with a five-room child care centre. The same plan describes Oakville NE #5 as a 926 pupil place school with a five-room child care centre, with construction set to begin in spring 2026 and an anticipated opening in September 2028. Earlier planning documents pointed to 2026-27 and later to 2027-28, which shows how often these dates move.
Catholic School Plans
On the Catholic side, HCDSB's North Oakville #3 Catholic Elementary School is listed as a project under way, with provincial capital funding for 671 pupil spaces and the address 3500 Post Road. The Town of Oakville has a site plan application on file for it, describing a two-storey elementary school with a child care centre. The board's Long-Term Capital Plan lists these target years, which the board says can change:
HCDSB Project in Oakville | Type | Target Shown by the Board |
|---|---|---|
North Oakville #3 CES | New elementary school (project under way) | 2028-29 |
North Oakville #1 CSS | New secondary school | 2029-30 |
North Oakville #5 CES | New elementary school | 2031-32 |
North Oakville #2 CES | New elementary school | 2032-33 |
North Oakville #3 CES boundary review | Boundary review | Within 1 to 5 years |
Elementary French Immersion program or boundary review | Administrative review | Within 1 to 5 years |
Temporary Redirections and Holding Schools
A redirection is different from a boundary change. The HDSB procedure defines a temporary redirection as sending students to schools outside their local catchment when a school has reached capacity or an unexpected event affects its space, and it states plainly that a redirection is not a boundary review. In practice, redirections usually apply to new registrations, so a family that moves in during a busy year can be treated differently from a family that registered a year earlier.
North Oakville has seen several. HDSB lists these on its redirection pages:
Redirection | What It Does | Status on HDSB's Pages |
|---|---|---|
Dr. David R. Williams PS to Palermo PS | Sent new Senior Kindergarten to Grade 8 English registrations to Palermo PS once Dr. David R. Williams reached its enrolment and classroom cap; began 11 April 2023 | Suspended 14 January 2025; the board says it will be reinstated if the cap is reached again |
Falgarwood PS to Dr. David R. Williams PS | Sent new JK and SK registrations from certain zones north of Dundas to Dr. David R. Williams PS from 31 October 2024 | Paused in August 2025 |
Forest Trail PS to Sunningdale PS | Directs new French Immersion registrations from Forest Trail PS to Sunningdale PS from 1 February 2026, because of portable pressure at Forest Trail | Listed as active; the Northwest Oakville review is also meant to address pressure at Forest Trail |
North Oakville secondary redirection | Directed some North Oakville secondary students to schools outside the home catchment from September 2022 | Paused since October 2024 |
In each case, the board's pages say students already attending were not affected, and only new registrations were redirected.
If you are buying a newly built home, ask the builder whether the agreement contains a school accommodation warning and read it. A buyer considering a pre-construction home will often find one, since in growing areas the boards commonly warn that students may be placed in temporary facilities or in schools outside the community until permanent space is available.
Busing and Transportation
Busing follows the designated school, not the school you would prefer. Eligibility is based on distance, and Halton Student Transportation Services lists more than 1.6 km for Grades JK to 8 and more than 3.2 km for Grades 9 to 12. Confirm eligibility for the exact address and program with HSTS. For the new secondary school, HDSB's locator page says transportation eligibility for the 2027-28 school year must be confirmed on the HSTS website once that information is available, which HDSB expects in spring 2027.
If you are relying on a cross-boundary or optional attendance request, plan as if busing will not be provided. The secondary locator states this directly for families outside the new school's boundary.
A Worked Example: Two Children, One Address
Suppose a family is buying in spring 2027 on a street that the Option 3 maps place inside the new high school's English boundary. They have one child finishing Grade 8 in June 2027 and another finishing Grade 10.
The Grade 8 child. If the child is in the English track, the board's notes direct Zones 2 to 10 to Oakville NE #1 HS for Grade 9 in September 2027. If the child is in French Immersion, the Option 3 maps place students at White Oaks SS, Garth Webb SS or Iroquois Ridge HS depending on the zone, and those placements remain subject to the Northwest Oakville review.
The Grade 10 child. Students in Grades 10 to 12 as of June 2027 can remain at their existing school with transportation. But this family is moving in, not already enrolled, so the parents should ask HDSB whether the exemption applies to a student who registers after June 2027.
The sibling question. Younger siblings can stay at White Oaks with an older sibling under the approved option. Whether that helps a newly arriving family is another question to put to the board in writing.
Busing. The family checks HSTS for both schools once the 2027-28 eligibility information is posted, because the new school's walk zones are still preliminary.
The point of the example is not the specific answer. It is that one address can produce different schools for different children, programs and years, and the official maps let you work this out before you buy.
What to Watch in 2027
Several decisions are expected during 2027, and each could affect a home you are considering:
The Northwest Oakville elementary review. Options, a public information session and a trustee decision are expected, with changes possible from September 2027. This is the review that will settle French Immersion pathways north of Dundas.
The new high school's name. The trustees' choice still needs Ministry of Education approval before the official announcement.
HSTS eligibility for 2027-28. HDSB expects transportation eligibility for the new secondary school to be posted in spring 2027.
Oakville Transit service to 4020 Sixth Line. The board says details will be shared before the school opens.
Oakville NE #5 construction. The accommodation plan targets September 2028, and its opening could restart the Dr. David R. Williams redirection or shift boundaries again.
HCDSB's North Oakville #3 boundary review. The Catholic board lists it within the next one to five years, ahead of a 2028-29 target for the school.
Due Diligence Before You Buy
A few simple checks can keep a school surprise from catching you after closing. These steps are a practical order to work through before you make an offer.
Search Every Program
Run the HDSB and HCDSB tools for every program you might choose, including French Immersion, and save dated screenshots of the results.
Read the Review Pages
Open the board's list of current boundary reviews and look for any review that names your schools. Note the expected decision date and implementation year.
Map the Zone
For secondary planning, find the street on the Option 3 maps and match it to the implementation charts.
Ask About Redirections
Call or email the school or board planning staff to ask whether new registrations at your address are currently redirected.
Check the Builder's Warnings
On a new home, read any school warning clause in the agreement and ask your lawyer what it means for timing.
Keep Expectations Flexible
If a specific school is essential, build in a plan for the case where the boundary or program changes. Comparing the best high schools in North Oakville alongside the boundary maps can help you see which programs are available if a placement shifts.
Common Mistakes
Trusting a listing's school list. Listings describe nearby schools, not designated ones. Only the boards' tools assign an address.
Checking only the English track. French Immersion and Catholic boundaries are separate and often follow different lines.
Assuming the new high school serves all of North Oakville. Under Option 3, Zone 1 English-track students are directed to Garth Webb SS, and French Immersion is not offered at the new school.
Reading a review as a decision. Nothing changes until trustees vote, and timelines often slip.
Forgetting redirections. A full school can send new registrations elsewhere even when the boundary has not changed.
Assuming busing. Transportation depends on the designated school and distance, and optional attendance usually means no bus.
Final Thoughts
North Oakville school boundaries are moving because the community is still filling in. A new high school opens in September 2027, an approved secondary boundary phases in over three years, an elementary review is under way, and more schools are planned on both boards. None of that makes buying here a gamble if you check the official tools, read the review pages and charts, and ask the board the questions that apply to your family. Once you know which areas fit, you can start browsing North Oakville homes for sale with the school picture in mind.
FAQs
How do I find the designated school for a North Oakville address?
Enter the full address in the HDSB Find Local School tool for public English and French Immersion schools, and in the HCDSB School Finder for Catholic schools. For high school from September 2027, also use the HDSB Oakville Secondary School Address Locator. Repeat the search before you firm up an offer.
When does the new North Oakville high school open?
HDSB plans to open the school at 4020 Sixth Line in September 2027 with Grades 9 and 10, then add Grades 11 and 12 in 2028 and 2029. Its official name still needs trustee selection and Ministry of Education approval.
Will my child have to leave White Oaks Secondary School?
Under the approved Option 3, students in Grades 10 to 12 as of June 2027 can remain at their existing school with transportation, and younger siblings can stay with an older sibling at White Oaks until that sibling graduates. Families moving in after June 2027 should confirm with HDSB how the exemption applies to them.
Does the new high school offer French Immersion?
No. HDSB's address locator page states that French Immersion programming will not be offered at the new school. Use the Find Local School tool to see the French Immersion secondary school for your address, and note that French Immersion boundaries north of Dundas still depend on the Northwest Oakville review.
What is the difference between a boundary review and a redirection?
A boundary review is a formal process that trustees start and decide, and it changes which addresses belong to a school. A temporary redirection sends new registrations to another school when a school is full. HDSB's procedure states that a redirection is not a boundary review.
Could my home's school change after I buy?
Yes. Boundaries can change through reviews, new school openings and redirections. Check the HDSB and HCDSB review pages for any review that names your schools, and keep a backup plan if one school is essential to your decision.









